随笔分类 - ABB自动化
摘要:继续学习。 A.2 Object data: AC 900F and AC 900FR 对象数据:AC 900F和AC 900FR There are no differences between the object data of the AC 900F controller in the Pl
阅读全文
摘要:这篇文档正文部分已经学习完了,现在时该文档的附件部分。 Appendix A Hardware object data 附件A 硬件对象数据 A.1 Calling up object data 调出对象数据 When the I/O editor is selected in the main m
阅读全文
摘要:继续学习。 6.4 Power fail signal (PF) and power fail 电源故障信号和电源故障 I/O modules maintain the last values until they have recognized the connection interruptio
阅读全文
摘要:继续学习,这个文档也没剩多少了。 6.3 Startup and shutdown performance of the modules 模块的启停性能 The input and output values are communicated on a cyclic basis between th
阅读全文
摘要:继续学习 6.2 Task behavior in the event of an error 错误事件中的任务行为 上图中单词简单,就不翻译了 6.2.1Resource behavior in the event of an unrecoverable task error 在不可恢复错误中的资
阅读全文
摘要:继续学习,进入第六章 6 Processing and error handling 处理和错误处理 This section provides information on error handling at task level, on the resource behavior in the
阅读全文
摘要:继续学习,今晚争取进入第六章 5.2 Changing a non-redundant process station into a redundant one 非冗余过程站改为冗余 1. The following exports must be performed from each proce
阅读全文
摘要:5.1.5 Technical redundancy data 冗余技术数据 Failure detection 故障检测 Both redundancy partners (Primary and Secondary) monitor each other via the redundancy l
阅读全文
摘要:继续学习 5.1.4 Redundancy statuses 冗余状态 Status diagram of the Primary 主控制器节点状态 no OS 没有操作系统 No active operating system 没有活动的操作系统 no redundant 没有冗余 The ope
阅读全文
摘要:继续学习 5.1.3 Redundancy criteria 冗余准则 A redundancy toggle between Primary and Secondary is forced when the self-test diagnosis reveals the following con
阅读全文
摘要:继续学习 5.1.2 Redundancy toggle 冗余切换 If any of the following conditions occur at the Primary, a redundancy toggle is initiated deliberately between Prima
阅读全文
摘要:继续学习 5.1.1 Synchronization 同步 The basic behavior of all redundant process stations is identical. The terms Primary and Secondary in the following text
阅读全文
摘要:继续学习,进入第五章。 5 Controller redundancy 控制器冗余 5.1 Overview 概述 The availability of the AC 900F and AC 800F process stations can be increased by operation i
阅读全文
摘要:4.3 Controller Webpage 控制器网页 The controller web page provides many information about the status of the process station, hardware and software configur
阅读全文
摘要:继续学习,这个文档终于学了100页了,还剩60页,继续努力吧。 4.2 Status displays in the hardware structure 硬件结构的状态显示 After loading the resource in the station, the system or stati
阅读全文
摘要:继续学习,来到这个文档的第四章,也进入83页的学习。没有实际动手的练习,总是有点务虚。 4 Commissioning 调试 During commissioning, the configured programs and applications are loaded into the stat
阅读全文
摘要:继续学习,3.10 AC 900F用户变量存储 3.10 Permanent storage of user variables on AC 900F AC 900F用户变量永久存储 In a Freelance controller all user data (e.g. IEC1131 glob
阅读全文
摘要:继续学习,ABB 过程站 AC 900F接口模块 3.9 Interface modules for AC 900F and AC 700F AC 900F和AC 700F的接口模块 3.9.1 PROFIBUS module CI 930F The CI 930F interface module
阅读全文
摘要:3.6 Parameters of the AC 800F and AC 800FR controllers AC 800F和AC 800FR控制器参数 3.7 Parameters of the AC 700F controllers AC 700F控制器参数 跳过这两个章节,因为重点是学习AC
阅读全文
摘要:继续学习,这是此文档的第八篇学习笔记,开始3.5 AC 900F控制器参数的学习 3.5 Parameters of the AC 900F controllers AC 900F控制器参数 The AC 900F process station can be used in six variant
阅读全文

浙公网安备 33010602011771号