1;階段:
System Analysis &
Design (SA&D),
System Implementation & Integration (SI&I),
System Maintenance & Support (SM&S)
|
Milestone
|
Deliverables
|
Acceptance
Criteria
|
|
1.
Project Initiation
|
- Project Initiation Document
- According to the project
management methodology proposed and adopted
|
|
|
2.
Definition of Problems
|
- Current Environment
Description
- Business Activity Model
- User Requirements
- According to the related
methodology of the SOA-QPS2 and with reference to the related Government IT
methodologies and technical standards
|
|
|
3.
Selection of Feasible Options
|
- System Specifications
- Selected Technical System
Option
- According to the related
methodology of the SOA-QPS2 and with reference to the related Government IT
methodologies and technical standards
|
|
|
4.
System Analysis & Design
|
- Prototypes
- SA&D Report
- Business Impact Analysis
- Site Specification
- Procurement plan
- Procurement specification
and/or procurement list
- According to the related
methodology of the SOA-QPS2 and with reference to the related Government IT
methodologies and technical standards
|
|
|
5.
Physical Design
|
- Physical Data Design
- Process Data Interface
- Data Catalogue
- Program Specification
- Performance Optimization Report
- According to the system
design and development methodology proposed and adopted
|
|
|
7.
Program Development
|
- Program codes and Software modules
- Job Control Procedures
- Program codes and software
modules are produced according to the program specifications
|
|
|
8.
Unit Test
|
- Unit Test Cases and Results
- No discrepancies between the
actual test output and the expected output, or any remaining discrepancies
are understood
|
|
|
9.
System Integration and Test
|
- System Test Plan, Specifications and Results
- Software modules in integration
- No discrepancies between the
actual test output and the expected output, or any remaining discrepancies
are understood
|
|
|
10. User Acceptance
|
- Acceptance Test Plan, Specifications and Results
- Load Test Plan, Specifications and Results
- "Passing tests" S/W modules
- Expected results meeting
system objectives and user requirements
|
|
|
12. Data Conversion
|
- Data Conversion Plan
- Data Conversion Report
- Conversion is completed
successfully according to the data conversion plan and procedures
|
|
|
13. Training
|
- Training Plan
- Training Manual
- Training Courses
- Trained Users
- Conducted according to the
Training Plan
|
|
|
14. System Installation & Enhancement based on security risk
assessment and audit report
|
- Change Log and Statistics
- Impact Analysis Report
- Test Cases, Test Data, Acceptance Test Plan, Specification,
Training Plan, Acceptance Test Report, Implemented Change / Enhancement
- Updated Documentation
- Problems are fixed; remedial
actions or recommendations are taken; system is accepted and certified in
good condition
|
|
|
15. System Installation & Production
|
- System Installation Plan
- H/W and S/W modules in integration
- System Installation Report
- Computer Systems in production use
- SMART System in production
according to the System Specification
|
|
|
16. Prepare System Documentation
|
- Application Operation Manual
- Computer Operation Procedures Manual
- Data Manual
- Program Manual
- System Maintenance Plan
- System Manual
- User Procedures Manual
- Security Incident Handling Procedure
- Backup & Recovery Procedures
- Business Impact Analysis
- Business Continuity Plan which includes a Disaster Recovery Plan
- According to the system
design and development methodology proposed and adopted and with reference to
related guidelines where relevant
|
|
|
17. Nursing
|
- System Nursing & Maintenance
- Hand-over Plan
- System performance at a
pre-defined acceptable level
|
|
|
18. Disaster Recovery Drill
|
- Disaster Recovery Drill Test Report
|
- Drill is completed
successfully according to the disaster recovery plan and procedures;
|
|
19. Project Closure
|
- Project Evaluation Report
- According to the project
management methodology proposed and adopted
|
|