Collective Purchase Requisition
摘要:The Collective Purchase Requisition is used to group the Purchase Requisition items when generated 'directly' from the Project. It won't be considered when MRP process triggers the creation of Purchase Requisition.测一下Network type = MUL1的表现 MUL1在Network profile = MULU001中 依此Network profil
阅读全文
posted @
2011-04-01 11:10
懒芒果
阅读(594)
推荐(0)
Storage Location在物料分配时的选择逻辑
摘要:在Item Cateogry = L的情况下:当物料在MARD表里仅有一条S/L记录 当物料分配给项目时, 该唯一的S/L将被读出 当物料在MARD表里有多条S/L记录 S/L将保留为空 以上逻辑在INCLUDE LCOMKF1O中实现 (1) Here is checked, whether a storage location was entered on the detail screen. If yes, this one will be taken.(2) MARD (the table where the storage location data for the material
阅读全文
posted @
2011-02-25 10:39
懒芒果
阅读(1690)
推荐(0)
Revision Level在PS中的决定
摘要:何为Revision Level:You can identify material or document changes that are made with reference to a change number by the use of revision levels.When you want to process the BOMs for these materials or documents at a later date, you can find and call them using either the change number or the revision l
阅读全文
posted @
2011-02-22 17:12
懒芒果
阅读(1757)
推荐(0)
Procurement Indicator in PS
摘要:1. 建立三个procurement indicator 1 > Reservation for netwotk with item category L (ZWH)2 > Purchase requisition for netwotk with item category N (ZSE)3 > 3rd party purchase requisition with item ...
阅读全文
posted @
2011-02-22 13:36
懒芒果
阅读(713)
推荐(0)