文控编码规则
|
1 |
2 and 3 |
4 |
5 |
|
AGPCA |
The owner - ON |
Letter - LE |
0001 |
|
|
CPECC civil - CL |
Transmittal – TN |
0001 |
|
|
CPECC Taraz - TA |
Monthly Report - MR |
0001 |
|
|
CPECC Alamty - AL |
Weekly Report - WR |
0001 |
|
|
Vendor - VD |
Documents Issued for Approval - IA |
0001 |
|
|
Subcontractor - SC |
Meeting minutes - MM |
0001 |
|
|
Other parties - OT |
Memo - ME |
|
|
|
|
Other - OT |
|
Notes:
1 - Code of Project
2 - General Code of Document
3 - Department/Specialty Code
4 - Type of Document
5 - Document Sequence Number
6 – Any document except drawings
001; 002; 003… for drawings and construction procedure
7 - Revision
AGPСE–M–DO–MA–0001-000-0
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
|
AGPСE |
M |
Control Dep. - CO |
Index of Document – IN |
0001- |
000 |
|
|
|
E |
Contract Dep.- CT |
Plan – PL |
0001- |
000 |
|
|
|
|
Construction Dep.- CS |
Management Manual – MA |
0001- |
000 |
|
|
|
|
HSE Dep. - HS |
Procedure Document – PR 过程文档 |
0001- |
000 |
|
|
|
|
Quality Dep. - QC |
Technical Specification – SP 技术规格说明书 |
0001- |
000 |
|
|
|
|
Human Resources Dep. - PE |
Data Sheet – DS 数据表格 |
0001- |
000 |
|
|
|
|
Documents Control and Translation Dep. - DO |
Change Order – CO 改变zhiling |
0001- |
000 |
|
|
|
|
Administration Dep. - AD |
Calculation – CA 计算 |
0001- |
000 |
|
|
|
|
Financial Dep. - FA |
Drawing – DW 图纸 |
0001- |
000 |
|
|
|
|
Procurement Dep.- PU |
List – LI 清单 |
0001- |
000 |
|
|
|
|
Commissioning Dep. - CM 调试 |
Equipment List – EL 设备清单 |
0001- |
000 |
|
|
|
|
Engineering Dep. - EN |
Material List – ML物资清单 |
0001- |
000 |
|
|
|
|
Civil/Contruction - CV土建 |
Supporting Document – SD 文档支持 |
0001- |
000 |
|
|
|
|
Instrumentation - IN仪表 |
Technical Scheme – TS 技术方案 |
0001- |
000 |
|
|
|
|
Electrical - EL电气 |
Letter of Inquiry – LQ 询价函 |
0001- |
000 |
|
|
|
|
Mechanical - MA机械 |
Technical Evaluation Report - TR 技术评标报告 |
0001- |
000 |
|
|
|
|
Other - OT |
Other – OT |
0001- |
000 |
|
|
|
|
Pipeline - PL |
Report – RE |
0001- |
000 |
|
|
|
|
Cathodic Protection - CP 阴极保护 |
Alignment sheet – AS 对准表 |
0001- |
000 |
|
|
|
|
Process - PR 过程 |
Detail drawing – DT |
0001- |
000 |
|
|
|
|
Station piping -SP 站管道 |
Engineering Requisition – ER 技术申请 |
0001- |
000 |
|
|
|
|
Telecommunication – TE 电信 |
Material Requisition – MR 物资申请 |
0001- |
000 |
|
|
|
|
Plot plant –PP 总图 |
Общие данные – GD (в Word);DW (как чертеж в AutoCad) |
0001- |
000 |
|
|
|
|
Water supply and sewerage - WS 供水和污水处理 |
|
0001- |
000 |
|
|
|
|
Inside networks of water supply and sewerage - WW水水供应和污水处理内部网络 |
|
0001- |
000 |
|
|
|
|
External networks of water supply and sewerage - EW水供应和污水处理外部网络 |
|
0001- |
000 |
|
|
|
|
Heating, Ventilation, air conditioning - HV 暖气,通风,空调 |
|
0001- |
000 |
|
|
|
|
Fire fighting – FF 防火 |
|
0001- |
000 |
|
|
|
|
Heat mechanics - TS 热力学 |
|
0001- |
000 |
|
|
|
|
Heat networks (inside areal, interside areal) - TN 热网内面 |
|
0001- |
000 |
|
浙公网安备 33010602011771号