Components Installation of the Two-stage Mill
As we all know, mining crusher refers to the crushing machinery whose content is more than 50% of the total content, the row compound particle size is greater than three millimeters. It is invented by British Hengan. according to the feeding and nesting size, the crushing operations are often divided into coarse crushing, medium crushing and crushing. The commonly used equipments are impact crusher, compound crusher, single stage hammer crusher, vertical crusher, gyratory crusher, roll crusher machines, double roll crusher, combo crusher, and so on. the crusher is widely used in mining, metallurgy, building materials, road, railway, water conservancy and chemical industry and many other sectors. Common crushing machines are winnowing mill, hammer crusher, impact crusher, roll crusher, compound crusher. Jaw crusher, having large crushing ratio, uniform particle size, simple structure, reliable operation, easy maintenance, operating costs and economic characteristics. PF-I series impact crusher can process materials side length is 100 to 500 mm, the compressive strength is up to 350 MPa, great crushing ratio.
Now, let us introduce the knowledge of two-stage crushing equipment installation:
The two-stage grinder (double stage crusher) host
equipment installation :
1) two-stage grinder equipments can be installed
together with the motor on a concrete foundation or rack, the ground should be
smooth, when installing ,the machine must be level.
2)The machine should be
installed feeding device to ensure uniform feeding, and avoid clogging.
3)
motor wiring should be strictly in accordance with the direction of the rotor
wiring rotation.
4)In order to ensure the safe operation of the gangue
grinder, we must install the ammeter to control feeding,and ensure the normal
load.
Installation of the two-stage grinder unit (double stage
crusher):
1) each equipment should be connected firmly with each other,the
pipe joints strives to be tight to prevent gas leakage, if the pipe joints leak,
it will not only generate dust pollution, but also decline the production
capacity and product quality.
2) electrical control cabinet should be
installed at the place where is easy to operate, easy to observe the location of
the equipment, various equipments' electrical connection lines and control
lines should be arranged and placed in alignment tube according to the relevant
provisions of the state .
3) electrical control cabinet should be fitted with
the drive button, stop button of equipment, work lights, grinder ammeter,
feeding motor , grading motor speed control knob and various protective
devices.
4) all two-stage shredder equipments must be installed in accordance
with the relevant provisions.