| Yestoday, I planed to read some scripts a, but I haven't time the whole day. |
|
| Why I was so busy? |
|
| |
|
| I have a training to Ferran Gomis, from 9:30-11.00.because he could not catch the Chinese trduring the QRU training |
90 |
| received 27 email. Discuss the PIM project email with Paul and Bai . |
40 |
| post a request to SBS for telephone group |
5 |
| check if the build manager have role in pek_shu |
2 |
| telephone and ask the house question |
5 |
| ask how to downloand software to mobilephone |
10 |
| answer build manager of component question |
20 |
| answer PSE build manager question, and test bm_daily_prepare, analysis result, run bm_daily_prepare need 2-3 hours every time, I run twice, the build manager run at least three time, during bm_daily_prepare running, we can do some parallel job. |
160 |
| ask Paul about test harnest |
20 |
| I have two meeting, 3:00-3:30, 4:30-5:10 |
70 |
| ANALYSIS: |
|
| My most time be used for support and training. The training not happened everyday, only about 3 hours every month. So most time used for support. Support include resolve problem and test the LCM script. Test script about BM ans resolve build problem reallly waste time, because I had to analysis the every line in log file. |
|