上一页 1 ··· 17 18 19 20 21 22 23 24 25 ··· 29 下一页
摘要: Question:在SAP中会将Work Center中的工时,费用等归结Cost Center中,对于这种关系几它们之间的数据传送关系,哪位可以介绍以下 或者如何维护Work Center and Rounting以及如何在两者之间建立联系,在Work Center and Rounting需要维护哪些需要的资料万分感谢!!Answer :你的问题比较复杂:costomize 部分:1,你要定义work center categories.2,定义work center的usage,standard value key,operation control key.系统应用方面cost要定义a 阅读全文
posted @ 2013-07-23 23:14 jefflu99 阅读(3844) 评论(0) 推荐(0)
摘要: Activity TypesActivity types are used to describe the various forms of activity that are performed at a cost center.Activity types are valuated for each cost center and period with a charge rate that consists of a fixed portion and a variable (work-related) portion. Thus the costs incurred at a cost 阅读全文
posted @ 2013-07-23 22:46 jefflu99 阅读(996) 评论(0) 推荐(0)
摘要: 在对一笔production order进行手动做confirm的时候,跳出了下面的错误 :点开看了其中的错误原因,需要到后台进行配置为这个plant和order type:SPRO-- > Production --> Shop floor control -->Operations --> Confirmation --> Define confirmation parameters 阅读全文
posted @ 2013-07-21 20:27 jefflu99 阅读(1239) 评论(0) 推荐(0)
摘要: Stock posting (BSX) - This transaction is used for all postings to stock accounts. Such postings are effected, for example: In inventory management in the case of goods receipts to own stockand goods issues from own stock.In invoice verification, if price differences occur in connection withincoming 阅读全文
posted @ 2013-07-21 17:26 jefflu99 阅读(911) 评论(0) 推荐(0)
摘要: 今天在手动创建production order的时候,系统给了如下的错误: no cost element segment exists for 799999 on date 2013-xx-xx , 去查了一下具体的原因,查找原因的时候当然要结合到FI的account(FS00)的设置 和OBYC里面的accout posting的配置 。 从给出的提示我们可以猜到--某个消耗性账户没有define成本要素部分,也就是没有为这个account来定义一个成本要素 ; 看起来原因是很明显的。对应于生产订单的消耗性账户,对应到SAP的科目分配必须是损益类科目(P&L account)请看下 阅读全文
posted @ 2013-07-21 17:23 jefflu99 阅读(1203) 评论(0) 推荐(0)
摘要: When I am going to save the production order after released carried out . see the screen-shot below , the error is about the costing of productionmore details as below (see screenshot) 阅读全文
posted @ 2013-07-20 00:38 jefflu99 阅读(261) 评论(0) 推荐(0)
摘要: SAP MRP4 View:MRP4 View contains the following fields:Selection Method:This field determines which Alternative Bill of Material the system selects during the MRP run. It is a Standard SAP Pre-configured selection. With Selection by order quantity, the system chooses the alternative BOM into whose lo 阅读全文
posted @ 2013-07-20 00:25 jefflu99 阅读(779) 评论(0) 推荐(0)
摘要: Work Scheduling View: To produce an assembly or subassembly, youneed to maintain a work scheduling view for the material. Production Scheduler:They have to be configured in SAP IMG as required.Production Scheduler is the scheduler responsible for a material in production activity control. The produc 阅读全文
posted @ 2013-07-20 00:24 jefflu99 阅读(950) 评论(0) 推荐(0)
摘要: MRP 1 ViewThe MRP 1 View is a place holder for defining the Planning methods and lot sizing procedures of a give material at a plant/storage location level. If you are going to have a particular material planned in SAP, then you can go ahead and create a MRP views (MRP 1, 2, 3, and 4) MRP typeThe MR 阅读全文
posted @ 2013-07-20 00:23 jefflu99 阅读(2243) 评论(0) 推荐(0)
摘要: SAP MRP 2 View: Procurement Type (Plant Specific):Procurement type indicator defines how the material is procured. The following procurements types are possibleE = material is produced in-house, F = material is procured externally, X = material can be both produced in-house and procured externally X 阅读全文
posted @ 2013-07-20 00:22 jefflu99 阅读(1823) 评论(0) 推荐(0)
上一页 1 ··· 17 18 19 20 21 22 23 24 25 ··· 29 下一页