摘要:
There are N schedules, the i-th schedule has start time s i si and end time e i ei (1 <= i <= N). There are some machines. Each two overlapping schedu 阅读全文
posted @ 2018-10-18 15:37
nimphy
阅读(364)
评论(0)
推荐(0)
摘要:
There is a nonnegative integer sequence a 1...n a1...n of length n n . HazelFan wants to do a type of transformation called prefix-XOR, which means a 阅读全文
posted @ 2018-10-18 14:37
nimphy
阅读(135)
评论(0)
推荐(0)

浙公网安备 33010602011771号