摘要: I. Pre-Switchover Checks These steps should be completed before the switchover planned maintenance window begins. Our recommendation is that these are 阅读全文
posted @ 2017-12-08 17:14 feiyun8616 阅读(826) 评论(0) 推荐(0)
摘要: 转自 http://blog.csdn.net/notbaron/article/details/50927492 在Oracle 10g以上的版本,High version count可谓是一个臭名昭著的问题。Hight version count不仅仅产生的原因多种多样,并且会导致各种令人头痛的 阅读全文
posted @ 2017-12-08 12:24 feiyun8616 阅读(1562) 评论(0) 推荐(0)