Jaw Crusher broken materials which

    intermittent feeding the purpose to stop the kiln after a bricklaying job, be sure to empty all the raw materials in the kiln, otherwise when the temperature rises, this part of the material may be liquid at 600 of, on the grate ler may cause gambling plug.In this state, heating is more difficult to operate.If the excessive temperature rise in the temperature increase start, firebrick rapid expansion generate heat Benglie, shorten the life of the brick.The heating operation can be said to determine the life of the refrary bricks.So in the heating process require intermittent feeding, so that the firing zone hung layer kiln skin protection firebrick. (2).Operation intermittent feeding essentials when the the kiln temperature rose to 400 ~ 500 the volume of feed 100t / h switch from the slow turn to the main motor, kiln speed to 0.7rpm adjust K-IDF, (burner flame stability to improve negative pressure) to invest 30 ~ 40t of raw materials to the firing zone (takes about 10 to 20 minutes).Must pay attention to point (1) intermittent feeding two people at the same time, a Yaotou observation kiln internal report to the operator to the intermittent feeding after about 30 minutes of raw materials should be able to reach the firing zone.Most in need of attention: the raw materials to the burner flame.The TV screen in the control room can not accurately determine the kiln internal situation, the person can be observed only in the kiln before issued to adjust the the kiln speed of instructions. (In the control room2) the firing zone raw material as the temperature increases and become clinker, further increasing the temperature,brick making machine the raw material to start sticky, if the stickiness of the raw materials fall into the grate ler will be a major accident (causing castor pore blockage), if necessary, should abort warming.

   Yaotou kiln inlet installation and utilization of Active lime rotary kiln calcination 1.Before the installation of the preparatory work before the installation to be familiar with the drawings and related technical documents to understand the requirements of the device structure and installation techniques,jaw crusher installation sequence is determined according to the specific conditions and methods, to prepare necessary  alicey599 installation tools and equipment, preparation of construction organization design and installation plan,[Mobile Crusher:http://www.xb-machine.com/Crushing_Machinery/Mobile-Crusher.html] carefully the integrity and quality of the equipment components should be checked in the process of construction quality quickly complete the installation task to install the units in the acceptance of the equipment (handed over by the construction unit),cone crusher if there is an insufficient number or manufacturing defects caused by transport storage process should advance notify the unit managed to complement and eliminate defects.About important dimensions related to the quality of the installation should be Figure check to make records, and agreed to be amended and design units.Prior to installation of the parts, it is necessary to carry out the cleaning work, go decontamination rust.Must be familiar with prior to demolition drawings to understand the structure, so as not to damage the parts.And should check in advance to make up for each other with the number and logo, in order to avoid parts confused or lost, affecting asbly.Removing and cleaning work must be carried out in a clean environment.

   Antirust part should be cleaned immediately with fresh oil, used oil should be consistent with the quality of the drawings under the lubricants then properly closed iediately, to prevent contamination or corrosion.In parts of the process of lifting handling, lifting equipment and tools such as wire rope and hook must have a sufficient margin of safety.The work surface of the wire rope is not allowed with zero direct contact reducer and bearing cap lifting hook or eyebolt care axle end the lifting hole only allowed for the lifting itself, is not allowed as lifting the entire asbly, about These should pay particular attention.The horizontal movement of the parts must be balanced, does not allow casual inverted or erected.Cylinder sections of the wheel with and supporting roller smooth cylindrical parts must be fixed to the sleepers rack,Rotary kiln then roll bar support below.Use winches to drag, will never be allowed on the ground or roll bars on traction forward.Need to install find Zhengda ring gear and cylinder plate moving kiln shell, you can use wire rope wrapped around the cylinder, and then hoist or a ride drag, the disk automatically empty Simplified required circumferential force can be 20 tons consideration safety factor when choosing a wire rope diameter shall not be less than 2, the wire rope should be on after hanging rack pulley lifting crane or word leads to the smallest moment have suffered because of the pull up riding wheel bearing friction and cylinder, the best kiln drive means temporarily mounted disc kiln, which automatic welding on the cylinder interface, uniform speed, and to shorten working hours are more favorable.Short-term stop the kiln of the structural characteristics of the rotary kiln