New impeller design impact crusher
mill spiral tube shift troubleshooting measures Xxx is the contents of: DTM02290/410 mill thermoelectric fary boiler ancillary equipment, the frequent appearance of the spiral tube with hollow shaft connecting bolts break in production, the spiral tube ran out of the shift. Ball Mill Feed and the discharge end of the hollow shaft to install the spiral tube, spiral simple materials QT602 within spiral Jane, cast a propeller line,jaw crusher the spiral is sinistral or dextral decided under the direction of rotation of the grinding body material into the propeller mill in vivo or launched mill vitro.Spiral tube into the hollow shaft in its outer wall wrapped around the multi-storey stone cotton,cone crusher 30 ~~ 40 thickness, in order to reduce the heat to the bearing lining. Larvae in the outer surface of the spiral tube with hollow shaft for clearance with the design of minimum clearance O. 5ram, maximum gap 1.12ram, spiral simple alicey599 to install in place, use bolts spiral tube flange and hollow shaft link with, so that the spiral tube with the hollow shaft without relative motion.Towel at the outer surface of the hollow shaft larvae L meet the gap, in the case of the mill body rotation, the spiral tube in the hollow shaft bore oval track movement of the spiral tube.
In addition, the spiral tube conveying the vibration generated by the axial reaction force generated in the materials process and ball hammer, causing the link bolt loose formation of the phenomenon of the slide wire, leading to the spiral tube ran} H shift. Piece along the circumference to the increase in the spiral tube outer wall with the surface j-4-M24 bolt hole bolt spiral Jane fixed.Processing in the other side of the side surface of the spiral tube 8 M16 bolt holes used to install - x to the flange and spiral Jane l ancient one fixed flange outer diameter greater than in the house axis of the bore diameter,[Mobile Crusher:http://www.xb-machine.com/Crushing_Machinery/Mobile-Crusher.html] so that spiral Jane constraints in the newly added two flanges and four mounting bolts hereinafter set within the hollow shaft. Will allow flue gas to produce a certain intensity of the vortex, and the grate combustion zone before and after the convection,Mobile Crusher the balance of the furnace before and after the excess air the problem of uneven mixing combustion of combustible gases,stoner crusher carbon particles and oxygen to create a t distribution of conditions,Rotary kiln the flame is full of charge.Around the arch between the throat and the secondary air blockade to suppress the high-temperature radiation of the furnace arch regenerative efficiency of a high temperature combustion zone in the space under the arch, greatly extended the burning time of coal particles, gases, with the body incomplete combustion The loss of a significant reduction in reduction in the amount of fly ash reduces the amount of wear on the surface of the rear heat.Some data indicate that the furnace temperature is increased by IO ~ C, the chemical reaction rate will increase 24 times.This ash, high moisture content of coal, better digestion and absorption, so as to improve the thermal efficiency, the purpose of consumer stew dust.
浙公网安备 33010602011771号