The role of the mill double helix shape grading the liner
"Nanjing highway and waterway transport," the 11th Five-Year "development plan" disclosed yesterday, the reporter was informed from the Nanjing New Highway 14 in eight years, the expansion of the two highways.8 years additional 14 highway according to the plan in eight years, Nanjing highway construction investment of over 35.3 billion yuan, the total mileage and total mileage will both exceed 400 km, including high-speed Ninghuai, Ning mussels Expressway, Ning Chang high-speed, two Ninghang around more road southeast section has been started.Then will be to start the construction of the Li River Ma high-speed (the Lishui between Ma On Shan, built in 2011), around the more road xianlin segment (2010 built), the Huning two channels (2012),sand making machine around the northeast segment of the more road (built in 2013) Wu Li River high-speed (Wuhu Gaochun Liyang, built in 2013), high-speed pump instrument (Pukou to Yizheng, built in 2014), rather Vision high-speed (Nanjing Gaochun to Xuancheng, built in 2014), latitude seven passing river tunnel (built in 2008), the Yangtze River Bridge and the cable (built in 2011), and Nanjing-Nantong Expressway and Ning - high-speed six-lane expansion."Ring" to expand 500 square kilometers, according to the introduction, Ninghuai high speed around more road Jiangbei an important part of the main city area, will open to traffic in September this year, have been built around the higher the speed, the northeast section of Xianlin segment, the southeast section of connected with the Yangtze River Bridge, will form a complete Nanjing Second Ring Road.
Nanjing Second Ring Road via the Jiangning District, Qixia District, Luhe District, Pukou area, the basic trend of around about 10 kilometers outside the Ring Road and then draw a circle, making the expansion of about 500 square kilometers area of anjing city.It is alicey599 reported that the "Ring" and Nanjing all out of the city expressway,Rotary dryer national highway,[rock crusher:http://www.xb-machine.com] provincial highway connected along to set up a lot of interchange interoperability, then not only the vehicle transit more convenient,[brick making machine:http://www.xbm-aac.com] and greatly ease the traffic pressure in the city, will be further expanded the scope of the main city promote economic development.The Li River Ma high-speed, high speed of the Wu Li River, Pu instrument high-speed, high-speed after the completion of the Ning Xuan, Nanjing economic radiation capacity of the surrounding cities will be further enhanced.Township 15 minutes highway network, the city will be on nine national and provincial highways to upgrade a highway standard, that the original two-way two-lane road broadens to four-lane two-way, including 104 State Road, Jiangning District fangzhen Dobashi town of paragraph completion (2011),Rotary Kiln 104 Provincial Highway Lishui and Dongfeng Town, Gaochun Chun Town (completed this year), 123 Provincial Highway the Gaochun Shuangpai Dan Zhian emblem Beaver plot (completed in 2007), 340 Provincial Highway Lishui county screen to the east town of paragraph (completed in 2008), 122 Provincial Highway Hundertwasser Bridge Xintang (completed in 2009), 243 Provincial Highway Lukoujichang extension of (2011 completion), 341 Provincial Highway Lishui East (2012 completion), the 123 provincial highway, golden frog, Lishui County Gaochun Shuangpai stone paragraph (completed in 2012),jaw crusher 239 provincial road the Gaochun eastern section of the (completed in 2014).According to reports, in combination with the national highway, provincial highway construction of the foundation, the city will be part of the county and township road construction, further encryption rural road network, and ensure that car starting from any township in the city, the highway network within 15 minutes.
浙公网安备 33010602011771号