01 2013 档案
withdrawal Qty exceed requirement Qty in production order 生产订单中提货数超出需求数
摘要:Question:In our system, withdrawal Qty can exceed requirement Qty for a production order, even we use planned GI. That means when we use MIGO/MB1A to process GI to reference production order, we can manually change withdrawal Qty. Even this Qty has exceed requirement Qty of production order, system 阅读全文
posted @ 2013-01-17 15:35 sunjun0427 阅读(783) 评论(0) 推荐(0)
为什么MB51本位币金额和采购订单历史本位币金额不一样?
摘要:Why does the value in the field "amount in local currency" in a materialdocument, sometimes differ from the valued displayed for this materialdocument in the purchase order history.Answer:These two fields relate to different FI postings. The field in thematerial document (MSEG-DMBTR) is fi 阅读全文
posted @ 2013-01-11 15:26 sunjun0427 阅读(1359) 评论(0) 推荐(1)