跟小D每日学口语

软件项目管理常用单词解说

以下为收集的一些软件项目管理中的常用单词简写:


PI:Project Initiation(项目启动)
PPL:Project Plan(制定项目计划,Establish PPL)
SRS: Software R一些equirements Specification, 也有可能是System Requirements Specification
STP:System Testing Plan(系统测试计划)
HLD: High Level design,也叫General design (概要设计)
ITP:Integration Testing Plan(集成测试计划)
LLD: Low Level design,也叫Detail design (详细设计)
UTP:Unit Testing Plan(单元测试计划)
Coding(编码)
UT:单元测试
IT:集成测试
ST:系统测试
Release:产品发布
UAT: User Acceptance Testing(用户验收测试)
Project Closure:项目关闭
SOW: Statement of work。
AR:分配需求。
COO:Chief Operation Officer(首席运营官)
CPM:Chief Project Manager(主管项目经理)
PM:项目经理
QA:quality assurance(质量保证)
SE:System Engineer
SWE:Software engineer(软件开发工程师)
TC:Test Controler(测试控制)
TE:Testing Engineer(测试工程师)
CMO:Chife Marketing Officer(首席营销官)
MC:度量协调

QAM:Quality Assurance Manager
SEPG:Software Engineer Process Group(软件工程过程组)
Process Handbook (项目过程手册)PHB
Estimation Sheet (估计记录)EST
Project Plan (项目计划)PPL
conifguration Management Plan( 配置管理计划)CMP
Software Quality Assurance Plan (软件质量保证计划)QAP
Software Risk Management Plan (软件风险管理计划)RMP
Test Strategy(测试策略)TST
Work Breakdown Structure (工作分解结构)WBS
Business Requirement Specification(业务需求说明书)BRS
Software Requirement Specification(软件需求说明书)SRS
System Testing plan (系统测试计划)STP
System Testing Cases (系统测试用例)STC
High Level Design(概要设计说明书)HLD
Integration Testing plan (集成测试计划)ITP
Integration Testing Cases (集成测试用例)ITC
Low Level Design (详细设计说明书)LLD
Unit Testing Plan ( 单元测试计划)UTP
Unit Testing Cases (单元测试用例)UTC
Unit Testing Report (单元测试报告)UTR
Integration Testing Report (集成测试报告)ITR
System Testing Report (系统测试报告)STR
Requirements Traceability Matrix (需求跟踪矩阵)RTM
Configuration Status Accounting (配置状态发布)CSA
Change Request Form (变更申请表)CRF
Weekly Status Report (项目周报)WSR
Quality Weekly Status Report (质量工作周报)QSR
Quality Audit Report(质量检查报告)QAR
Quality Check List(质量检查表)QCL
Phase Assessment Report (阶段评估报告)PAR
Closure Report (项目总结报告)CLR
Review Finding Form (评审发现表)RFF
Minutes of Meeting (会议纪要)MOM
Metrics Sheet (度量表)MTX
ConsistanceCheckForm(一致性检查表)CCF
Baseline Audit Form(基线审计表)BAF
Program Trace Form(问题跟踪表)PTF

posted @ 2015-03-11 15:14  Danny Chen  阅读(1167)  评论(0编辑  收藏  举报